{"id":6656,"date":"2023-08-31T05:00:03","date_gmt":"2023-08-31T11:00:03","guid":{"rendered":"https:\/\/www.flatironcorp.com\/?p=6656"},"modified":"2023-10-17T15:54:53","modified_gmt":"2023-10-17T21:54:53","slug":"bronx-river-parkway-bridge-replacement","status":"publish","type":"post","link":"https:\/\/www.flatironcorp.com\/news\/bronx-river-parkway-bridge-replacement\/","title":{"rendered":"Flatiron\u2019s E.E. Cruz to Deliver Bronx River Parkway Bridge Replacement"},"content":{"rendered":"

August 31, 2023<\/p>\n

The new bridge will replace a deteriorated bridge over Amtrak and CSX rail lines on the Bronx River Parkway \u2013 improving safety and mobility. Innovative construction methods will reduce traffic and train-travel disruption during construction.<\/i><\/p>\n

The New York State Department of Transportation (NYSDOT) has selected Flatiron\u2019s E.E. Cruz subsidiary for the $137.7 million best-value bid-build project to replace the Bronx River Parkway Bridge. The complex infrastructure project will require ongoing collaboration with Amtrak, CSX, MTA and the current Penn Station Access project.<\/p>\n

\u201cWe welcome this opportunity to collaborate with NYSDOT and construction partners to improve safety and mobility of transportation infrastructure in the Bronx,\u201d said Joe Sheehan, President, E.E. Cruz & Co. Inc. \u201cThroughout the project, we will demonstrate our commitment to the community by embracing the NYSDOT\u2019s Disadvantaged Business Enterprise utilization goals and by prioritizing procurement of services and materials from local businesses.\u201d<\/p>\n

The innovative construction solution proposed by E.E. Cruz includes using a custom-engineered lifting system versus a conventional crane setup to build the mainline of the bridge. During construction, this should reduce Bronx River Parkway lane closures as well as Amtrak\/CSX general track outages that are required for demolition and construction of the new structure.<\/p>\n

Along with the bridge replacement, the E.E. Cruz project team will improve roadway alignment, provide standard 12-foot travel lanes, add shoulders and construct a dedicated exit ramp to East 177th<\/sup><\/span> Street. Construction is scheduled to begin in September 2023 \u2013 with completion expected in August 2026.<\/p>\n

This project strengthens the E.E. Cruz infrastructure construction portfolio in the New York metropolitan area \u2013 adding to vital projects such as the Battery Park City Authority North\/West Resiliency project announced in February and the currently underway MTA Forsythe Street Emergency Ventilation Plant. These projects are consistent with the E.E. Cruz and Flatiron strategy to build on successful relationships in local markets and to secure contracts offering balanced risk profiles and opportunities for enhanced collaboration with clients.<\/p>\n

 <\/p>\n

About E.E. Cruz & Co.<\/strong><\/p>\n

E.E. Cruz & Co. Inc. is a Flatiron subsidiary delivering innovative heavy civil construction solutions throughout the New York \/ New Jersey metropolitan area. E.E. Cruz has grown steadily from a focus on utility and highway projects to completing complex and challenging transportation, infrastructure, deep foundation, bridge and geotechnical resiliency projects.<\/p>\n

 <\/p>\n

About Flatiron<\/strong><\/p>\n

Flatiron is the trusted partner to deliver innovative solutions to infrastructure challenges across the U.S. and Canada. Flatiron collaborates with public and private clients to deliver heavy civil infrastructure \u2013 including highways and bridges; aviation, rail and transit; dams and water treatment facilities; and underground projects. For more on how Flatiron is transforming infrastructure, visit www.flatironcorp.com<\/span><\/a>. Flatiron is a subsidiary of HOCHTIEF, an engineering-led global infrastructure group.<\/p>\n

 <\/p>\n

Media Contact<\/strong><\/p>\n

Mike Swenson
\n1.720.494.8132
\n
press@flatironcorp.com<\/a><\/p>\n","protected":false},"excerpt":{"rendered":"

The New York State Department of Transportation (NYSDOT) has selected Flatiron\u2019s E.E. Cruz subsidiary for the $137.7 million best-value bid-build project to replace the Bronx River Parkway Bridge.<\/p>\n","protected":false},"author":22,"featured_media":6657,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"inline_featured_image":false,"ngg_post_thumbnail":0,"footnotes":""},"categories":[29,40],"tags":[86,585,28,179,549,584],"class_list":["post-6656","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-news-release","category-project-news","tag-bridges-to-prosperity","tag-bronx-river-parkway-bridge","tag-featured","tag-flatiron","tag-flatiron-project","tag-new-york"],"acf":[],"_links":{"self":[{"href":"https:\/\/www.flatironcorp.com\/wp-json\/wp\/v2\/posts\/6656"}],"collection":[{"href":"https:\/\/www.flatironcorp.com\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.flatironcorp.com\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.flatironcorp.com\/wp-json\/wp\/v2\/users\/22"}],"replies":[{"embeddable":true,"href":"https:\/\/www.flatironcorp.com\/wp-json\/wp\/v2\/comments?post=6656"}],"version-history":[{"count":0,"href":"https:\/\/www.flatironcorp.com\/wp-json\/wp\/v2\/posts\/6656\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.flatironcorp.com\/wp-json\/wp\/v2\/media\/6657"}],"wp:attachment":[{"href":"https:\/\/www.flatironcorp.com\/wp-json\/wp\/v2\/media?parent=6656"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.flatironcorp.com\/wp-json\/wp\/v2\/categories?post=6656"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.flatironcorp.com\/wp-json\/wp\/v2\/tags?post=6656"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}