{"id":6502,"date":"2023-04-27T08:05:51","date_gmt":"2023-04-27T14:05:51","guid":{"rendered":"https:\/\/www.flatironcorp.com\/?p=6502"},"modified":"2023-04-27T08:10:00","modified_gmt":"2023-04-27T14:10:00","slug":"flatiron-completes-san-gabriel-river-bridge-hinge-project","status":"publish","type":"post","link":"https:\/\/www.flatironcorp.com\/news\/flatiron-completes-san-gabriel-river-bridge-hinge-project\/","title":{"rendered":"Flatiron Completes San Gabriel River Bridge Hinge Project"},"content":{"rendered":"

Flatiron completed the Interstate 210 – San Gabriel River Bridge Hinge Replacement Project in December 2022. Flatiron was the prime contractor for the project that began in May 2022. The $17 million project is located in Los Angeles County on Interstate 210 in the city of Irwindale near Interstate 605.<\/p>\n

This segment of I-210 is a conventional 12-lane, divided freeway with 12-foot lanes and 10-foot standard shoulders. The 800-foot span over the San Gabriel River is a major Los Angeles freeway system artery. Work included:<\/p>\n