{"id":6498,"date":"2023-04-25T12:03:23","date_gmt":"2023-04-25T18:03:23","guid":{"rendered":"https:\/\/www.flatironcorp.com\/?p=6498"},"modified":"2023-04-25T12:07:13","modified_gmt":"2023-04-25T18:07:13","slug":"san-diego-west-mission-bay-bridge-complete","status":"publish","type":"post","link":"https:\/\/www.flatironcorp.com\/news\/san-diego-west-mission-bay-bridge-complete\/","title":{"rendered":"San Diego’s West Mission Bay Bridge Complete"},"content":{"rendered":"
The elegant, new West Mission Bay Drive Bridge \u2014 designed to evoke stones skipping across water \u2014 is complete. Flatiron was the prime contractor for the $148 million project, which includes 12 acres of wetland restoration and <\/span>improved access for drivers, bicyclists and pedestrians to several San Diego beach communities.<\/p>\n The project received $138 million from the <\/span>Federal Highway Administration<\/a>, including $80 million from the <\/span>Bipartisan Infrastructure Law<\/a>.<\/span><\/p>\n Construction began in 2018 to ease traffic congestion and improve transportation across the San Diego River. The project features:<\/span><\/p>\n The previous structure was constructed in the early 1950s and declared obsolete to handle increased traffic volume by the California Department of Transportation.<\/span><\/p>\n","protected":false},"excerpt":{"rendered":" The elegant,\u00a0new West Mission Bay Drive Bridge \u2014 designed to evoke stones skipping across water \u2014 is complete. Flatiron was the prime contractor for the $148 million project, which includes 12 acres of wetland restoration and\u00a0improved access for drivers, bicyclists and pedestrians to several San Diego beach communities.<\/p>\n","protected":false},"author":22,"featured_media":6499,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"inline_featured_image":false,"ngg_post_thumbnail":0,"footnotes":""},"categories":[40],"tags":[85,130,28,179,549,367],"class_list":["post-6498","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-project-news","tag-bridges","tag-construction","tag-featured","tag-flatiron","tag-flatiron-project","tag-san-diego"],"acf":[],"_links":{"self":[{"href":"https:\/\/www.flatironcorp.com\/wp-json\/wp\/v2\/posts\/6498"}],"collection":[{"href":"https:\/\/www.flatironcorp.com\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.flatironcorp.com\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.flatironcorp.com\/wp-json\/wp\/v2\/users\/22"}],"replies":[{"embeddable":true,"href":"https:\/\/www.flatironcorp.com\/wp-json\/wp\/v2\/comments?post=6498"}],"version-history":[{"count":0,"href":"https:\/\/www.flatironcorp.com\/wp-json\/wp\/v2\/posts\/6498\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.flatironcorp.com\/wp-json\/wp\/v2\/media\/6499"}],"wp:attachment":[{"href":"https:\/\/www.flatironcorp.com\/wp-json\/wp\/v2\/media?parent=6498"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.flatironcorp.com\/wp-json\/wp\/v2\/categories?post=6498"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.flatironcorp.com\/wp-json\/wp\/v2\/tags?post=6498"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}\n