{"id":6168,"date":"2022-07-10T22:43:51","date_gmt":"2022-07-11T04:43:51","guid":{"rendered":"https:\/\/www.flatironcorp.com\/?p=6168"},"modified":"2022-07-13T12:56:20","modified_gmt":"2022-07-13T18:56:20","slug":"flatiron-breaks-ground-on-steveston-interchange-project","status":"publish","type":"post","link":"https:\/\/www.flatironcorp.com\/news\/flatiron-breaks-ground-on-steveston-interchange-project\/","title":{"rendered":"Flatiron breaks ground on Steveston Interchange Project"},"content":{"rendered":"

[vc_row][vc_column][vc_column_text]Flatiron has started work on the Steveston Interchange Project in Richmond, British Columbia. This is an important element of the Highway 99 Tunnel Program to improve travel time and safety along the Highway 99 corridor.<\/p>\n

 [\/vc_column_text][\/vc_column][\/vc_row][vc_row][vc_column width=”1\/2″][vc_column_text]A July 7th groundbreaking ceremony marks the official start of construction on the $87.5 Million Design-Build Flatiron project that is being delivered by TI Corp and being funded by the Province of British Columbia.<\/p>\n

Among those participating in the groundbreaking were B.C. Minister of Infrastructure and Transportation Rob Fleming, MLA for Richmond-Steveston Kelly Greene, MLA for Richmond-Queensborough Aman Singh, MLA for Richmond-South Centre Henry Yao, Richmond Mayor Malcolm Brodie and Musqueam Indian Band Chief Wayne Sparrow.<\/p>\n

Initial construction activities are ramping up at the Steveston Interchange site this summer, with clearing and utility relocations underway in the upcoming weeks. Major construction will begin later this year, with opening of the new interchange slated for 2025.<\/p>\n

 [\/vc_column_text][\/vc_column][vc_column width=”1\/2″][vc_single_image image=”6170″ img_size=”Large” add_caption=”yes”][\/vc_column][\/vc_row][vc_row][vc_column][vc_column_text] <\/p>\n

\u201cWe are pleased to collaborate with the Province of British Columbia to deliver this major improvement to the Highway 99 corridor,\u201d said Ken Tanner, Flatiron Vice President\u2013Operations for Canada. \u201cThis project is consistent with Flatiron\u2019s strategy to build on successful relationships in local markets and to secure contracts that offer balanced risk profiles and opportunities for enhanced collaboration with our clients.\u201d<\/p>\n

The Steveston Interchange Project is a key part of the Highway 99 Tunnel Program to improve safety and mobility along Highway 99. The project will replace the existing two-lane overpass structure at Steveston Highway and Highway 99 with a new structure that accommodates two eastbound lanes and three westbound lanes. As part of the broader program, the new Steveston Interchange will improve connections for vehicles, transit users, pedestrians and cyclists.<\/p>\n

For more information:
\n\u2022 British Columbia Ministry of Transportation and Infrastructure News Release<\/a>
\n\u2022 Visit:
Project Overview \u2013 Highway 99 Tunnel Program<\/a>
\n\u2022 Subscribe to:
Newsletter \u2013 Highway 99 Tunnel Program<\/a><\/p>\n

About Flatiron<\/strong><\/p>\n

Flatiron is the trusted partner to deliver innovative solutions to infrastructure challenges across the U.S. and Canada. Flatiron collaborates with public and private clients to deliver heavy civil infrastructure\u2014 including highways and bridges; aviation, rail and transit; dams and water treatment facilities; and underground projects. For more on how Flatiron is transforming infrastructure, visit www.flatironcorp.com. Flatiron is a subsidiary of HOCHTIEF, an engineering-led global infrastructure group.<\/p>\n

Media Contact<\/strong><\/p>\n

Mike Swenson
\n1.720.494.8132
\n
press@flatironcorp.com<\/a>[\/vc_column_text][\/vc_column][\/vc_row]<\/p>\n<\/div>","protected":false},"excerpt":{"rendered":"

[vc_row][vc_column][vc_column_text]Flatiron has started work on the Steveston Interchange Project in Richmond, British Columbia. This is an important element of the Highway 99 Tunnel Program to improve travel…<\/p>\n","protected":false},"author":19,"featured_media":6171,"comment_status":"closed","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"inline_featured_image":false,"ngg_post_thumbnail":0,"footnotes":""},"categories":[40],"tags":[],"class_list":["post-6168","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-project-news"],"acf":[],"_links":{"self":[{"href":"https:\/\/www.flatironcorp.com\/wp-json\/wp\/v2\/posts\/6168"}],"collection":[{"href":"https:\/\/www.flatironcorp.com\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.flatironcorp.com\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.flatironcorp.com\/wp-json\/wp\/v2\/users\/19"}],"replies":[{"embeddable":true,"href":"https:\/\/www.flatironcorp.com\/wp-json\/wp\/v2\/comments?post=6168"}],"version-history":[{"count":0,"href":"https:\/\/www.flatironcorp.com\/wp-json\/wp\/v2\/posts\/6168\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.flatironcorp.com\/wp-json\/wp\/v2\/media\/6171"}],"wp:attachment":[{"href":"https:\/\/www.flatironcorp.com\/wp-json\/wp\/v2\/media?parent=6168"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.flatironcorp.com\/wp-json\/wp\/v2\/categories?post=6168"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.flatironcorp.com\/wp-json\/wp\/v2\/tags?post=6168"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}