{"id":1341,"date":"2014-04-25T16:40:27","date_gmt":"2014-04-25T16:40:27","guid":{"rendered":"http:\/\/theflatironblog.com\/?p=1341"},"modified":"2014-04-25T16:40:27","modified_gmt":"2014-04-25T16:40:27","slug":"field-note-route-101-santa-maria-bridge","status":"publish","type":"post","link":"https:\/\/www.flatironcorp.com\/news\/field-note-route-101-santa-maria-bridge\/","title":{"rendered":"Field Note: Route 101 Santa Maria Bridge"},"content":{"rendered":"

\"Santa<\/a>
\nFlatiron has recently completed a $34.8 million project for the California Department of Transportation in Santa Maria, Calif. The Route 101 Santa Maria River Bridge project involves the widening\u00a0and retrofit of two existing 29-span bridges crossing the Santa Maria River at the San Luis Obispo\/Santa Barbara County line several hours north of Los Angeles.<\/p>\n

The project creates a third travel lane in each direction in addition to a bike lane along the southbound span and\u00a0widening the shoulders from two feet to 10. Flatiron\u00a0self-performed\"Santa the pile driving work, lofting and driving 187 CISS piles, erecting 261, 72-foot-long, 45,000-pound\u00a0precast girders and constructing all of the roadway and drainage work except the asphalt paving.<\/p>\n

The project was completed in March, approximately two months ahead of schedule.<\/p>\n","protected":false},"excerpt":{"rendered":"

Flatiron has recently completed a $34.8 million project for the California Department of Transportation in Santa Maria, Calif. The Route 101 Santa Maria River Bridge project involves…<\/p>\n","protected":false},"author":3,"featured_media":1345,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"inline_featured_image":false,"ngg_post_thumbnail":0,"footnotes":""},"categories":[40],"tags":[110,130,179,354],"class_list":["post-1341","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-project-news","tag-cdot","tag-construction","tag-flatiron","tag-route-101-santa-maria-bridge"],"acf":[],"_links":{"self":[{"href":"https:\/\/www.flatironcorp.com\/wp-json\/wp\/v2\/posts\/1341"}],"collection":[{"href":"https:\/\/www.flatironcorp.com\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.flatironcorp.com\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.flatironcorp.com\/wp-json\/wp\/v2\/users\/3"}],"replies":[{"embeddable":true,"href":"https:\/\/www.flatironcorp.com\/wp-json\/wp\/v2\/comments?post=1341"}],"version-history":[{"count":0,"href":"https:\/\/www.flatironcorp.com\/wp-json\/wp\/v2\/posts\/1341\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.flatironcorp.com\/wp-json\/wp\/v2\/media\/1345"}],"wp:attachment":[{"href":"https:\/\/www.flatironcorp.com\/wp-json\/wp\/v2\/media?parent=1341"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.flatironcorp.com\/wp-json\/wp\/v2\/categories?post=1341"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.flatironcorp.com\/wp-json\/wp\/v2\/tags?post=1341"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}