{"id":1237,"date":"2013-12-20T09:00:22","date_gmt":"2013-12-20T09:00:22","guid":{"rendered":"http:\/\/theflatironblog.com\/?p=1237"},"modified":"2013-12-20T09:00:22","modified_gmt":"2013-12-20T09:00:22","slug":"french-valley-parkway-update","status":"publish","type":"post","link":"https:\/\/www.flatironcorp.com\/news\/french-valley-parkway-update\/","title":{"rendered":"French Valley Parkway Update"},"content":{"rendered":"\"French\n

Flatiron is constructing a new off-ramp from southbound Interstate 15 to the French Valley Parkway in Temecula, CA.\u00a0 The 2,000-foot-long off-ramp will initially be one lane, but will eventually accommodate two lanes of traffic.\u00a0 Construction includes building four retaining walls.<\/p>\n

\u201cIt\u2019s going well,\u201d said project manager Justin Allington.\u00a0 \u201cWe\u2019ve significantly completed the off-ramp and are installing fence, irrigation, landscaping and a sidewalk in preparation for the opening.\u201d<\/p>\n

The project also includes the retrofit of an existing off-ramp and small bridge a half-mile down I-15.\u00a0 Crews are widening the existing off-ramp from one lane to two lanes.\u00a0 The team dug out, demolished and rebuilt the entire ramp during one weekend closure.<\/p>\n

The $14 million project for the City of Temecula began in June 2012.\u00a0 The new interchange opened in October, and the interchange and bridge retrofits are scheduled for completion in January 2014.\u00a0 This is phase one of a two-phase project.<\/p>\n","protected":false},"excerpt":{"rendered":"

Flatiron is constructing a new off-ramp from southbound Interstate 15 to the French Valley Parkway in Temecula, CA.\u00a0 The 2,000-foot-long off-ramp will initially be one lane, but…<\/p>\n","protected":false},"author":3,"featured_media":1238,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"inline_featured_image":false,"ngg_post_thumbnail":0,"footnotes":""},"categories":[40],"tags":[84,120,181,199,232],"class_list":["post-1237","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-project-news","tag-bridge-retrofits","tag-city-of-temecula","tag-flatiron-construction","tag-french-valley-parkway","tag-interchange"],"acf":[],"_links":{"self":[{"href":"https:\/\/www.flatironcorp.com\/wp-json\/wp\/v2\/posts\/1237"}],"collection":[{"href":"https:\/\/www.flatironcorp.com\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.flatironcorp.com\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.flatironcorp.com\/wp-json\/wp\/v2\/users\/3"}],"replies":[{"embeddable":true,"href":"https:\/\/www.flatironcorp.com\/wp-json\/wp\/v2\/comments?post=1237"}],"version-history":[{"count":0,"href":"https:\/\/www.flatironcorp.com\/wp-json\/wp\/v2\/posts\/1237\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.flatironcorp.com\/wp-json\/wp\/v2\/media\/1238"}],"wp:attachment":[{"href":"https:\/\/www.flatironcorp.com\/wp-json\/wp\/v2\/media?parent=1237"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.flatironcorp.com\/wp-json\/wp\/v2\/categories?post=1237"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.flatironcorp.com\/wp-json\/wp\/v2\/tags?post=1237"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}